Exchange 2013 Guide: 5. Deploying Exchange 2013 DAG

Deploying and Managing Exchange Mailbox High Availability

(3-Part Series)

II. Testing Database Availability Group Switchover and Failover


In this guide, you’ll see how to use the database availability group feature to ensure high availability and site resilience in your Exchange organization.
MaximumExchange.ru: Exchange 2013 Guide: 5. Deploying Exchange 2013 DAG


Exchange 2013 Guides series list:

  1. Using the Exchange Administration Center
  2. Deploying Site Mailboxes
  3. Creating an Exchange Certificate
  4. Deploying Exchange 2013 DAG: I. Creating a Database Availability Group
  5. Deploying Exchange 2013 DAG: II. Testing Database Availability Group Switchover and Failover
  6. Deploying Exchange 2013 DAG: III. Testing Client Access Load Balancing
  7. Exchange 2013 Guide: 7. Data Loss Prevention

4 thoughts on “Exchange 2013 Guide: 5. Deploying Exchange 2013 DAG”

  1. I’m fairly certain We’ve see this very same type of statement in other places, it needs to be gathering popularity with the world.

  2. This one is extremely useful! Is there any interactives like this for DPM or System Center generally? I’d love to have it.

Leave a Reply

Your email address will not be published.